A General Contractor with a Reputation of Excellence in the South Central US
A General Contractor with a Reputation of Excellence in the South Central US
Dixie Overland Construction completed the demolition and removal of a 100’ long 54” concrete flume and installed two new 54” HDPE pipes for lateral storage to increase the holding capacity of the Greggton-Longview Sewer Pump Station.
This work included the construction of two new concrete diversion boxes, and an extensive full time bypass to keep the pump station online 24/7.
Copyright © 2024 Dixie Overland Construction - All Rights Reserved.